1045 Hillsborro Mile Buildings 1 & 2 - Video inspection of the drainlines
Thursday, June 30, 2011 at 4:30PM Building two - Drain line inspection from the Roof down and out to the sewer
Found major cracks, broken sections of castiron pipe, missing pieces of castiron pipe, channel rott of cast ironpipe and roots. The pipe liner will work on most of the broken pipes. There is one pipe in this video, in which the castiron pipe can not be lined. The rest of the pipe can be lined with no difficulties.
Building one - Drain line inspection from the Roof down and out to the sewer
Found major cracks, broken sections of castiron pipe, missing pieces of castiron pipe, channel rott of cast ironpipe and roots. The pipe liner will work on most of the broken pipes. There is one pipe in this video, in which the castiron pipe can not be lined. The rest of the pipe can be lined with no difficulties.